Skip to content
Projects

Things I've built, explored and experimented with.

Some came from professional responsibilities, others from curiosity. The common thread is turning an idea into something usable.

2 personal projects5 professional projects — 71% of the total

7

Projects

5 professional · 71%

2 personal · 29%

Tools that recur (29 in total)

The six most reused tools. Hover or tap a row for the project count.

  • Google Apps Script — used in 2 projects.Google Apps Script
  • Google Sheets — used in 2 projects.Google Sheets
  • KPI Dashboards — used in 2 projects.KPI Dashboards
  • Field Operations — used in 1 project.Field Operations
  • Vendor Coordination — used in 1 project.Vendor Coordination
  • Procurement — used in 1 project.Procurement
  • Projects using the tool
  • Remaining scale

Selected projects

Professional Projects

Smartwall / BaLA Gujarat Execution

What was the problem?

End-to-end infrastructure deployment across 71 schools in Gujarat, coordinating field teams, vendors, material flow and school stakeholders across distributed locations.

What was my role?

Operations & Systems Lead — Edwiser Innovation Hub

What did I build or contribute?

61 of 71 sites completed. After 45 days of on-ground execution, a centralised tracking system was deployed in under one week, replacing fragmented manual coordination with shared operational visibility. Communication across 10+ field teams, vendors and school stakeholders was streamlined, cutting issue resolution time by 60% over two months. 95% of operational issues were resolved on the go, reducing query and complaint resolution from 24–48 hours to under 1 hour. The result was a repeatable framework for multi-site deployments.

Field OperationsVendor CoordinationProcurementCentralised TrackingEscalation Workflows
Professional Projects

Smartwall Operations Workflow — Google Sheets + Apps Script

What was the problem?

A single Google Sheet that ran an entire multi-team deployment: order intake, procurement, school clustering, artwork allocation, readiness, execution and closure, connected by Apps Script.

What was my role?

Process Architect & Builder — Edwiser Innovation Hub (Smartwall, Gujarat)

What did I build or contribute?

School orders, artwork requirements, material planning, stock availability and field updates were not connected in one flow. I mapped the process end to end — order receipt, procurement, school clustering, artwork allocation, school readiness, holiday-calendar status, execution and closure — and built it as a structured workflow inside one workbook. Apps Script consolidated and processed information into multiple connected sheets, giving Procurement, Design, Finance and Execution their own operational view while connected sheets rolled up KPI-level visibility. Automated triggers pushed each team and stakeholder their updated view every evening at 6:30 PM.

What did I learn?

I had never used Google Apps Script before. Rather than adding another application or over-engineering the answer, I learned it while solving the problem, using Gemini, ChatGPT and Claude as development assistants to understand, simplify, troubleshoot and progressively extend the code. What began as one operational fix became a scalable system supporting multiple workflows and departments from inside a spreadsheet. When you understand the problem deeply, the solution rarely needs to be complicated.

What changed because of it?

One workbook served five stakeholder groups with role-specific views, automated evening reporting and KPI rollups — replacing scattered manual coordination.

Google Apps ScriptGoogle SheetsWorkflow DesignAutomated TriggersKPI DashboardsAI-assisted Development

One workbook, seven stages

  1. 01

    Order receipt

    School orders logged in one place

  2. 02

    Procurement

    Material planning against live stock

  3. 03

    School clustering

    Sites grouped for efficient runs

  4. 04

    Artwork allocation

    Design mapped to each school

  5. 05

    School readiness

    Holiday calendar & site status

  6. 06

    Execution

    Field updates from the ground

  7. 07

    Closure

    Sign-off and KPI rollup

  8. Automated trigger

    Every evening at 6:30 PM, each team and stakeholder received their updated view.

The same data, five operational views

  • ProcurementMaterial demand, stock gaps, dispatch status
  • DesignArtwork queue per school cluster
  • FinanceOrder value, billing and closure status
  • ExecutionSite readiness, day plan, open issues
  • StakeholdersKPI rollup across every stage
Professional Projects

ETL Pipeline & PPT Production KPI Automation

What was the problem?

A Google Sheets dashboard and Apps Script ETL pipeline that automated production tracking, resource allocation and stakeholder reporting for a 3,515-slide programme.

What was my role?

Architect & Builder

What did I build or contribute?

Achieved 88.6% completion tracking (3,115 of 3,515 slides) with automated updates. Dashboards and KPIs updated dynamically for 6 team members, 46 PPTs (41 completed) and 19 voice profiles. A gamified leaderboard consolidated weekly metrics every Saturday, improving team performance over 3 weeks. Daily stakeholder email reporting covered completed vs. remaining production and team KPI snapshots, removing manual reporting and follow-ups.

Google Apps ScriptGoogle SheetsETL PipelinesKPI DashboardsAutomation
Professional Projects

MIM OS — Millionaires in Making

What was the problem?

An exploration into a business operating system designed around cognitive agents — not another productivity layer. Currently mapping the path to MVP: architecture, operating principles, agent structure and the first problems to solve.

What was my role?

Founder & AI Architect

What did I build or contribute?

MIM OS asks whether a coordinated cohort of cognitive agents can take on meaningful parts of a business's operating cadence — letting the founder spend more time thinking, building and architecting what comes next. The architecture and governing constitution are being defined now; the cohort is the intended design, not a deployed system.

What did I learn?

Systems dictate outcomes. The interesting question isn't what agents can do, but what should and shouldn't be delegated to them.

Multi-Agent OrchestrationAgent ArchitectureOperating CadenceGovernanceHuman-in-the-Loop DesignCloud Deployment
View project

Read the full MIM OS build story →

Personal Projects

THE UNASKED — AI-assisted editorial platform

What was the problem?

A publication exploring leadership, technology and career growth, built on a content architecture and AI-assisted editorial operating model.

What was my role?

Founder & Editor

What did I build or contribute?

AI-assisted workflows reduced content creation time by 80%, enabling 70% more articles per quarter while maintaining 100% brand consistency. Turning complex, overlooked questions into structured thought leadership drove a 300% increase in audience engagement within one month.

Content ArchitectureVisual IdentityAI-assisted Editorial Workflows
View project
Professional Projects

Flytech Training Records Digitisation

What was the problem?

Converted an aviation academy's manual training records into a centralised, colour-coded digital tracking system.

What was my role?

RPA Technician & Lab Instructor — Flytech Aviation Academy

What did I build or contribute?

Boosted operational efficiency by 60%+ and enabled alumni re-engagement, alongside coordinating DGCA-aligned lab, simulator, field-training, maintenance and documentation workflows for a 64% increase in training efficiency over 6 months.

ExcelProcess DesignData Modernisation
Personal Projects

RR Designs — Bundled Brand Packages

What was the problem?

Twenty bundled brand and design packages plus a design-to-print delivery network, built from 14+ years of freelance practice.

What was my role?

Founder & Designer — RR Designs

What did I build or contribute?

The packages reduced client-side vendor management by 70% and increased project completion speed by 55% for end-to-end brand experiences. The connected print network contributed to a 60% income increase through higher-value orders.

Adobe PhotoshopCanvaBrand SystemsPrint Partner Network

Prefer the entrepreneurial side?

Ventures — online, offline and seasonal — have their own page.